Setraco Group

BACK

East – West Road

A 338 Km dual carriageway connecting Warri town in Delta State to Oron Town In Akwa-Ibom State, Nigeria
  • Client
    Ministry of Niger Delta Affairs (MNDA)
  • Area
    Delta – Bayelsa – Rivers, Nigeria
  • Project Value
    1.5 Billion USD
  • Initiation Date
    July, 2006
  • Completion Date
    Ongoing
The East-West road project Consists of the construction of a second carriageway and the rehabilitation of the existing carriageway.

The total length of each carriageway of the road is 188 Km, with 29 river bridges of variable lengths ranging from 31m to 260m, and 2 box girder bridges with lengths of 700m and 850m.

It is one of the largest infrastructure projects in Nigeria as it is a very strategic road connecting the country’s 2 busiest and foremost commercial cities, Port Harcout and Worri.

Setraco mobilized vast technological, mechanical and human resources to site for this project to complete it in full speed by 2014.